DANGER!
Damage and injuries may occur if installation, maintenance or repair
work is carried out incorrectly
.
All installation, maintenance and repair work must only be performed by
authorised and trained specialist personnel in accordance with the applicable
local regulations. Safety regulations and prescribed protective clothing when
handling chemicals should be followed. Attention must be paid to the
information included on the product data sheet for the metering medium used.
Prior to all work the feeding of the metering medium should be disconnected
and the system cleaned.
NOTICE!
Only original equipment spare parts may be used for maintenance and
repairs.
CAUTION!
Before maintenance work, the water supply must be stopped and the inlet pipe
slackened by operating the dispenser
. Always observe the safety guidelines.
Ä
Chapter 2 ‘Safety’ on page 12
The maintenance interval is a max. 1 year; we recommend every 6 months.
7.1 Maintenance intervals
Interval Maintenance work Personnel
As required
General status:
External dirt:
Check the unit is clean and clean if necessary
.
Damage:
Check the unit damage and notify Ecolab Customer Service if necessary.
Specialist
Product cylinder:
Dirt:
Clean the product cylinder if necessary
.
Specialist
Every six months
Water inlet pipe and water-bearing components in the unit:
T
ightness:
As necessary. Replace seals or replace defective components.
Specialist
Service personnel
Swivel outlet:
blockage T
ightness:
clean and rinse the swivel outlet, replace if necessary.
Operator
Specialist
Spray nozzle:
Dirt:
Descale and replace if necessary
.
Specialist
Service personnel
Every year
Check the flow rate
Service personnel
Servicing and maintenance
37 MAN054128 Ver. 01-06.2024