7.2.8 Check the flow rate
Personnel:
n
Service Personnel
Protective equipment:
n
Protective eyewear
n
Chemical resistant protective gloves
Requirements:
n Front hatch open.
Ä
Chapter 7.2.2 ‘Opening the front hatch’ on page 38
n Product cylinder is removed.
Ä
Chapter 7.2.3 ‘Remove the product cylinder’
on page 39
n The water pressure of the fresh water supply is 3 bar ± 0.5 bar.
1. Cover the nozzle with a suitable container so that no water splashes out of the water
distributor
.
2. Feed the product drain pipe into a suitable container with quantity markers.
3. Press the release button for one minute.
4. Check how much water was extracted:
n SMAR
TPOWER
TM
Manual Dispenser RTU: 7.5 l/min ±1.5 l/min
n SMARTPOWER
TM
Presoak Dispenser RTU: 3 l/min ±1.5 l/min
n SMARTPOWER
TM
Pot&Pan Soak Dispenser RTU: 3 l/min ±1.5 l/min
5. If necessary
, have the flow rate of the instrument adjusted by Ecolab Customer
Service.
Ä
‘Manufacturer’ on page 11
Servicing and maintenance
47 MAN054128 Ver. 01-06.2024