EasyManua.ls Logo

Ecolab SMARTPOWER - Hydraulic Installation

Ecolab SMARTPOWER
62 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5.2 Hydraulic installation
Connecting the internal water supply
Personnel:
n
Service Personnel
n
Qualified employee
Protective equipment:
n
Protective gloves
n
Safety shoes
n
Protective eyewear
Material:
n
Plastic tube with 3/8-inch outer diameter
n
Shut-of
f valve T-piece 15mm x 15mm x 3/8-inch pipe
n
Adapter 3/8-thread x 3/8-inch tube
Connect the appliance to the hot water supply as described below.
Requirements
n The unit is mounted in accordance with the regulations.
n The water supply line is shut of
f.
CAUTION!
Damage to the unit if the permissible water pressure is exceeded
Always observe the max. permissible water pressures and temperatures
(see
Ä
Section Technical data on page 50 ).
If necessary, fit a pressure reducer and/or mixing valve upstream.
The connection for the water supply (feed line) must be located behind a
shut-off cock (angle valve).
Assembly and connection
29 MAN054128 Ver. 01-06.2024

Related product manuals