INNOVATION AND FLEXIBILITY
THE
INSTALLATION AND MAINTENANCE TRAINING MANUAL
Using a two-piece closedown, (eg gap 200mm)
7.11 Slimline Bulkhead Connector (7248)
When 5mm Primary m/ds need to be managed in a rack system, the normal way to do this is to use the bulkhead connector. Using this connector
allows control over the installation of the fibre bundle. M/ds can then simply be ‘plugged’ into the bulkhead from either side.
Refer to Demarcation methods in this manual.
7 Connectors
“This document is intended as a guide only. Whilst the information it contains is believed to be correct, Emtelle can take no responsibility for actions taken based on the information contained in this document. Emtelle reserves the
right to make changes to this document without notice. All sales of product are subject to Emtelle’s terms and conditions of sale only, which can be found on Emtelle’s website.”
64
INNOVATION AND FLEXIBILITY