EasyManua.ls Logo

Endress+Hauser Proline Promass I 300 - Mounting the measuring device

Endress+Hauser Proline Promass I 300
266 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation Proline Promass I 300 PROFINET
28 Endress+Hauser
1
1
2
2
1
5 (0.2) min. 15 (0.6)
SW 2.5
M3
A0029800
1 Cover borehole for the securing screw
2 Securing screw to lock the cover
6.2 Mounting the measuring device
6.2.1 Required tools
For sensor
For flanges and other process connections: Corresponding mounting tools
6.2.2 Preparing the measuring device
1. Remove all remaining transport packaging.
2. Remove any protective covers or protective caps present from the sensor.
3. Remove stick-on label on the electronics compartment cover.
6.2.3 Mounting the measuring device
L
WARNING
Danger due to improper process sealing!
Ensure that the inside diameters of the gaskets are greater than or equal to that of the
process connections and piping.
Ensure that the seals are clean and undamaged.
Secure the seals correctly.
1. Ensure that the direction of the arrow on the nameplate of the sensor matches the
flow direction of the fluid.

Table of Contents

Related product manuals