Table of contents
IQ Combiner 5/5C Quick Install Guide3
System congurations
Scenario 1: Solar only
Scenario 2: Solar + Battery without backup
Scenario 3 : Solar + Battery with backup
Scenario 4 : Sunlight backup
What’s in the box
Tools/additional items required
DER Breakers
Installation preparation checklist
Section A
Mounting the Product
Plan a location for the IQCombiner5/5C
Step 1: Minimum clearance
Step 2: Detaching the door
Step 3: Removing the dead front
Step 4: Mounting the IQCombiner 5/5C
Section B
Mounting the breakers
Internal view of
IQ Combiner 5/5C
Install DER Breakers
Section C
Wiring
Drill conduits
Wire size and torque table
Wire the input from PV
Wire the input from the IQBatteries
Wire the IQGateway
Wire the output connections
Wiring the control (CTRL) cable to headers
Wiring the control (CTRL) cable to headers
Control (CTRL) wiring between system components
Section D
Installing the
current transformers
Consumption CT installation in
grid-tied systems (load with solar conguration)
Consumption CT installation
in grid-tied systems (load-only conguration)
Consumption CT installation in grid forming systems
IQBattery 5P metering for
grid-tied systems
IQBattery 5P metering for grid-forming systems