EasyManua.ls Logo

Enterasys SecureStack B2 B2G124-48P - Considerations Prior to Installation

Enterasys SecureStack B2 B2G124-48P
91 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Considerations Prior to Installation
3-2 Hardware Installation
Considerations Prior to Installation
Wheninstallingthesw itch,notethefollowing:
•Beforestartingtheinstallationprocedure,notify thenetworkadministratorofthe
installation.
•Followtheinstallationproceduresintheorderaspresentedinthisguide.
•DonotconnecttheswitchtothenetworkuntilyouhaveestablishedthecorrectIP
address.
Required Tools
APhillipsscrewdriverisrequiredtoinstalltheswitchintoarack.
Unpacking the Switch
Unpacktheswitchasfollows:
1. Opentheboxandremovethepackingmaterialprotectingtheswitch.
2. Verifythatthecontents ofthecartoncontainstheitemslistedinTable 33.
3. Removethetapesealonthenonconductivebagtoremovetheswitch.
4. Performavisualinspectionoftheswitchforany
signsofphysicaldamage.Contact
Enterasys Networksifthereareanysignsofdamage.RefertoGettingHelpon
page 18fordetails.
Table 3-3 Contents of Switch Carton
Item Quantity
B2G124-48Por B2H124-48P switch device 1
Rack mounting bracket 2
M3x6-mm flathead screws 8
Rubber feet with adhesive backing for installation on a flat surface 4
AC power cord (The type of power cord is country-dependent.) 1
This installation guide 1
Customer Release Notes 1
URL notice card 1

Table of Contents

Related product manuals