EPSON Stylus Photo 925 Revision A
Disassembly and Assembly Disassembly 93
Figure 4-39. Tightening the Screws to secure the LD Roller Shaft Holder
T When installing the LD Roller Shaft Holder on the printer
mechanism, take care not to damage the teeth of the spur gear
35.2 or spur gear 23.2.
Figure 4-38. Installing the Spur Gears 35.2 and 23.2
T To secure the LD Roller Shaft Holder to the printer mechanism,
tighten the two screws in the numerical order as shown below.
Spur Gear 35.2
Spur Gear 23.2
C.B.S. SCREW, 3x6, F/ZN
LD Roller Shaft Holder
1
2
T Tightening torque for screws
• One screw securing the Head FFC Grounding Plate:
C.B.S. SCREW, 3x6, F/ZN
: 8 ~ 10kgf.cm
• Two screws securing the LD Roller Shaft Holder:
C.B.S. SCREW, 3x6, F/ZN
: 8 ~ 10kgf.cm
A D J U S T M E N T
R E Q U I R E D
T Once the LD Roller has been removed or when it has been
replaced with a new one, be sure to apply an appropriate amount
of grease G-26 to the specified points. Refer to
• Figure 6-4. “Lubrication point 3” in Chapter 6.
• Figure 6-5. “Lubrication point 4” in Chapter 6.