EDA 2530 Commissioning Procedure for Cable and Wireless Access
1/153 22-FGC 101 0239/2 Uen Rev J 2010-04-01
© Ericsson AB 2010
Commercial in confidence
73 (200)
e. In the “MAU AUTO NEGOTIATION” area of the window change the “Admin
Status” field from enabled to disabled. Now select the “Apply” button then
select “Refresh”.
f. Select another folder, & check that Port 1 interface changes colour from
Yellow to Green.
Note: The port status will only turn to Green if there is a signal on the fibre
and it is connected to the port.
7.2.2 Configure CP Port 2
Note: CP SFP Port 2 interface is used to subtend Child#1 (EDA 2510)
a. Select Port 2 and follow steps d. to f. of Section 7.2.1 above to configure CP
Port 2. Do NOT select the “Local In-Band Mng” option, this is required for CP
Port 1 only.
b. Select Close” to return to the main LCT screen.
7.2.3 Configure CP Port 3 (If required)
Note: CP SFP Port 3 interface is used to subtend Child#2 (EDA 2530)
a. Select Port 3 and follow steps d. to f. of Section 7.2.1 above to configure CP
Port 3. Do NOT select the “Local In-Band Mng” option, this is required for CP
Port 1 only.
b. Select Close” to return to the main LCT screen.
7.2.4 Configure CP Port 4 (If required)
Note: CP SFP Port 4 interface is used to subtend Child#3 (EDA 2530)
a. Select Port 4 and follow steps d. to f. of Section 7.2.1 above to configure CP
Port 4. Do NOT select the “Local In-Band Mng” option, this is required for CP
Port 1 only.
b. Select Close” to return to the main LCT screen.