handling equipment that can carry the 1,895 lb ice machine (empty weight) and properly
position it on the foundation.
Figure 13: Machine Rear
Site Preparations
Prepare foundation to meet physical requirements identified below. A reinforced concrete pad is
recommended. If the machine is subject to vehicular traffic, install protective pipe bollards as
needed. We recommend two (2) 6-inch concrete filled pipe bollards positioned a minimum of 40
inches off of the front two corners of the machine.