32
Connecting/replacing probe DMP10 / DMP20
The menu page displays the probe identifiers of the two probes: the old one
previously assigned to the batch, and the connected new probe.
5. Assign the connected probe to the batch: OK.
A message tells you that a calibration still needs to be assigned to the batch.
6. What would you like to do?
• Assign a calibration from the connected probe to the open: > select
desired calibration > OK.
This completes the process and the Measurement view of the batch
appears.
• Perform a new calibration for the batch: > New > follow the calibration
routine, for the procedure, see page 56.
This completes the process and the Measurement view of the batch
appears.