6270A
Operators Manual
36
Table 12. Tasks
1
2
5
3
4
6
huo013.eps
Item Indicator/Name Function
Leak Test
Opens a menu to configure and do a leak test on the system. See
Leak Test.
Switch Test Preprogrammed task to test a pressure switch dead band.
Exercise Opens a menu to configure and exercise a UUT. See Exercise.
Programs
Automated testing interface to make, edit, modify, save, and run a
user-configured automated test. See Programs.
CPS Cleanout
(Disabled when
CPS is OFF in the
Setup Menu)
Predefined sequence that cleans out the CPS with pressure. Useful
after testing a very dirty UUT where cross contamination could be a
factor.
Purge
(Disabled when
CPS is OFF in the
Setup Menu)
Opens a menu to configure and purge the plumbing in the Product.
See Purge (if CPS installed).