EasyManua.ls Logo

Fluke 6270A - Page 42

Fluke 6270A
84 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6270A
Operators Manual
36
Table 12. Tasks
1
2
5
3
4
6
huo013.eps
Item Indicator/Name Function
Leak Test
Opens a menu to configure and do a leak test on the system. See
Leak Test.
Switch Test Preprogrammed task to test a pressure switch dead band.
Exercise Opens a menu to configure and exercise a UUT. See Exercise.
Programs
Automated testing interface to make, edit, modify, save, and run a
user-configured automated test. See Programs.
CPS Cleanout
(Disabled when
CPS is OFF in the
Setup Menu)
Predefined sequence that cleans out the CPS with pressure. Useful
after testing a very dirty UUT where cross contamination could be a
factor.
Purge
(Disabled when
CPS is OFF in the
Setup Menu)
Opens a menu to configure and purge the plumbing in the Product.
See Purge (if CPS installed).

Table of Contents

Other manuals for Fluke 6270A

Related product manuals