❒ Position the control on top
❒
Insert one countersunk cross-head screw (A) each to the left and right through the
bracket and control from below
❒ Use nuts (B) to secure the countersunk cross-head screws from the top
❒ Put the top heat insulation mat on
➥ The heat insulation mat must be fully on the front sheet!
❒ Place the controller box on the boiler
❒
Use eight thread forming screws incl. contact washers (A) to install controller box
on the cable duct of the side panels
❒ Screw in two carrying bolts (B - hexagonal bolts M6 x 100) to the left and right at
the bottom rear side of the controller box far enough to ensure that the controller
box and insulation are supported adequately
Assembly
3
Installing the boiler
Montageanleitung S3 Turbo | M1870119_en-us 55