Contents
Fröling Heizkessel- und Behälterbau Ges.m.b.H, Industriestrasse 12, A-4710 Grieskirchen Page 5
Tel +43 (0) 7248 606-0 Fax +43 (0) 7248 606-600 info@froeling.com www.froeling.com
M1020008_en
3.3.11 Installing the underpressure controller............................................................. 30
3.3.12 Completing the combustion chamber door........................................................ 31
3.3.13 Install the insulating door .............................................................................. 31
3.3.14 Fitting the noise protection hood and ashcans ................................................... 32
3.3.15 Fitting switch cabinet and cable ducts .............................................................. 33
3.3.16 Final tests.................................................................................................... 34
3.4 Electrical connection 35
3.4.1 Laying the cable ........................................................................................... 35
3.4.2 Install the boiler sensor and sensor for the STL ................................................. 35
3.5 Connecting the thermal discharge safety device 36
3.5.1 Installing the thermal discharge safety device sensor......................................... 36
4 Initial startup / Decommissioning 37
4.1 Configuring the boiler 37
4.2 Mothballing 37
4.3 Disassembly 37
4.4 Disposal 37
5 Appendix 38
5.1 Delivery certificate - TMC 70-110 38