1 General Information 6
1.1 Notes on standards 6
1.2 Design information 7
1.2.1 Approval and obligation to report...................................................................... 7
1.2.2 Requirements for central heating water ............................................................. 7
1.2.3 Ventilation of boiler room ................................................................................ 7
1.2.4 Installing the heating system / Standards .......................................................... 8
Combination with storage tank .........................................................................8
Return feed lift...............................................................................................8
1.2.5 Chimney connection/chimney system ................................................................ 9
Draught limiter...............................................................................................9
Boiler data for constructing the flue gas system..................................................9
2 Technology 10
2.1 Turbomatic TMC 70-110 dimensions 10
2.2 Components and connections 11
2.3 Technical specifications 12
Test data for operation with wood chips........................................................... 12
Test data for operation with pellets ................................................................. 13
3 Installation 14
3.1 Transport 14
3.1.1 Positioning................................................................................................... 14
3.1.2 Temporary storage ....................................................................................... 14
3.2 Setting up in the boiler room 14
3.2.1 Removing the boiler from the pallet ................................................................ 14
3.2.2 Moving the boiler in the boiler room ................................................................ 14
3.2.3 Minimum distances in the boiler room.............................................................. 15
3.2.4 General information for boiler room................................................................. 15
3.3 Assembly work 16
3.3.1 Installing the chamber in the boiler ................................................................. 16
Installing fitted screws .................................................................................. 17
3.3.2 Installing the boiler insulation......................................................................... 17
Installing the insulation mounting brackets....................................................... 17
Installing the securing plate and impact plate for the WOS ................................. 18
Installing the insulating side panels................................................................. 18
Installing the front insulating side panels ......................................................... 19
Insulation - installing the chamber.................................................................. 23
3.3.3 Installing the induced draught fan................................................................... 24
3.3.4 Installing the WOS drive................................................................................ 25
3.3.5 Installing the heat exchanger ash removal unit ................................................. 26
3.3.6 Installing the chamber ash removal unit .......................................................... 27
3.3.7 Installing the combustion air blower fan........................................................... 27
3.3.8 Installing the stoker unit................................................................................ 28
3.3.9 Installing the igniter...................................................................................... 28
3.3.10 Installing the combustion chamber overpressure sensor..................................... 29