EasyManua.ls Logo

Fujitsu CELSIUS H730 - First-Time Setup and Operation; Unpacking and Initial Inspection

Fujitsu CELSIUS H730
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
First-time se tup of yo ur d evice
First-time setup of your devic
e
First- time setu pGettingstarted
Please read the chapter "Import ant notes", Page 12.
If your device is equipped with a W indows operating system, the necessary
hardware drivers and supplied software are a lready pre-installed.
Beforeyouswitchonthedevicefortherst time, connect it to the mains voltage
using the mains adapter, see "
Mains adapter connecting", Page 16.Themains
adapter m ust be connected during t he entire installation process.
A system test is performed when your device is rst switched on. Various messages
can appear. The display m ay rem ain dark for a short time or m ay icker.
Please follow the instructions on the screen.
NEVER switch off your device during the rst-time setup process.
On delivery, the battery can be found in the battery compartment or in the accessories kit.
The b attery must be charged if you want to operate your device u sing the battery.
When used on the move, the built-in battery provides the device with th e necessary power. You
can increase the operating time by using the available energy-saving functions.
For instructions on how to connect external devices (e.g. mouse, printer) to your
device, please refer to the operating manual for your device.
Unpacking and
checking the device
Should you discover any damage that occurred during transportation,
notify your local sales outlet immediately!
Unpack all the individual parts.
PackagingTransport
Check your
device for any visible da mage which may have occurred during transportation.
You may ne
ed the packaging in the future, if you n eed to transport your device.
Fujitsu 15

Table of Contents

Related product manuals