IMPORTANT
Make sure to record the connecting port for the disconnected FC cable.
6 Remove the Short wave SFP+ module (16Gbit/s).
(1) Open the Short wave SFP+ module (16Gbit/s) lever upward.
(2) Pull the Short wave SFP+ module (16Gbit/s) straight out of the port cage.
IMPORTANT
Make sure to store the removed Short wave SFP+ module (16Gbit/s) with the fixing lever and the
connector cover attached.
7 Install the Long wave SFP+ module (16Gbit/s).
(1) Remove the connector cover attached to the port of the Long wave SFP+ module (16Gbit/s) and
open the lever.
IMPORTANT
Keep the removed connector cover in a safe place where they will not be lost.
(2) Check the direction of the Long wave SFP+ module (16Gbit/s) and insert it all the way into the port
gauge.
(3) Close the Long wave SFP+ module (16Gbit/s) lever downward.
8 Connect the FC cable that is disconnected in Step 5.
Connect the FC cable connector to the FC port on the Long wave SFP+ module (16Gbit/s).
• When connecting the FC cables, position them so that they will not obstruct
replacement of the power supply unit or controllers by the maintenance
engineer.
9 Repeat Step 5 through Step 8
to replace multiple SFP+ modules (16Gbit/s).
10 If a wrist strap is used, remove the wrist strap.
4. Component Expansion/Function Enhancement
Installing Long Wave SFP+ Modules (16Gbit/s)
50 Operation Guide (Basic)