EasyManua.ls Logo

Fujitsu ETERNUS DX100 S3 - Page 31

Fujitsu ETERNUS DX100 S3
188 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2 Install the power distribution unit in the rack.
Fasten it to the prepared holes in the pillars with eight M5 screws.
(Rack pillar: rear)
M5 screw
M5 screw
3 Attach the blank panel to the rack front.
The blank panel should be attached at the same height as the power distribution unit.
(Rack pillar: rear)
(Rack pillar: front)
Blank panel
Power distribution unit
Chapter 2 Rack Installation
2.1 Installing Power Distribution Unit (for Regions Other than EMEA&I)
31
FUJITSU Storage ETERNUS DX100 S3/DX200 S3 Disk storage system Configuration Guide (Basic)
Copyright 2014 FUJITSU LIMITED
P3AM-7652-02ENZ0

Table of Contents

Other manuals for Fujitsu ETERNUS DX100 S3

Related product manuals