EasyManua.ls Logo

Fujitsu ETERNUS DX100 S3 - Installing Power Distribution Unit (2 U)

Fujitsu ETERNUS DX100 S3
188 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2.1.2 Installing Power Distribution Unit (2U)
This section explains how to install a 2U power distribution unit (12 outlet type or 16 outlet type) in a rack.
This section explains how to install a 12 outlet type power distribution unit as an example. This installa-
tion method can also be applied to a 16 outlet type power distribution unit.
1 Attach the M5 cage nuts to the rear rack pillar.
Attachment positions
On either side, insert eight M5 cage nuts in the 1st, 3rd, 4th, and 6th holes above the power distribu-
tion unit base line.
1U
1U
2U
Power distribution unit
Power distribution unit
(Rack pillar: rear)
Power distribution unit
base line
M5 cage nut M5 cage nut
1st hole
3rd hole
4th hole
6th hole
1st hole
3rd hole
4th hole
6th hole
[Left] [Right]
Attachment procedure
Clip the M5 cage nut tabs into the desired hole from the inside.
Side view
M5 cage nut
Rack pillar (square hole)
Chapter 2
Rack Installation
2.1 Installing Power Distribution Unit (for Regions Other than EMEA&I)
30
FUJITSU Storage ETERNUS DX100 S3/DX200 S3 Disk storage system Configuration Guide (Basic)
Copyright 2014 FUJITSU LIMITED
P3AM-7652-02ENZ0

Table of Contents

Other manuals for Fujitsu ETERNUS DX100 S3

Related product manuals