EasyManuals Logo

Furuno FELCOM 16 User Manual

Furuno FELCOM 16
187 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #156 background imageLoading...
Page #156 background image
7. MAINTENANCE, TROUBLESHOOTING
7-6
7.3.3 Results of PV test
1. At the standby display, press the [F7] key to display the Options menu.
2. Press the [7] key to display the Test menu.
3. Press the [2] key to display the results of the PV test.
1. Login
2. Logout
3. Abort
4. Select NCS
5. Ocean Region
6. Test
Options
1. PV Test
2. PV Test Result
3. Self Test
4. Distress Alarm Button Test
Test
Test Date & Time
Attempts
BBER
Shore-to-Ship Attempts
Ship-to Shore Attempts
Distress Alert
Signal strength
Overall Result
02-02-25 01:58 (UTC)
First attempt
Pass
First attempt
First attempt
Pass (Test OK)
Pass (Greater than Std level + 10dB)
Pass (Applicable tests pass)
Ctrl+P: Print ESC: Quit
PV Test Result
Sample PV test results
4. To return to the standby display, press any key.
Interpreting the PV test results display
Test Date & Time: Date and time of test
Attempts: Number of times the PV test was conducted.
BBER: Bulletin Board Error Rate (%). “Pass” appears for no
error.
Shore-to-Ship Attempts: Number of tests initiated by LES.
Ship-to-Shore Attempts: Number of tests initiated by MES.
Distress Alert: “Pass (Test OK)” appears for successful testing.
Signal Strength: “Pass” appears if signal strength is greater than
standard level.
Overall Result: “Pass” appears for satisfactory completion of the
test.

Table of Contents

Other manuals for Furuno FELCOM 16

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Furuno FELCOM 16 and is the answer not in the manual?

Furuno FELCOM 16 Specifications

General IconGeneral
BrandFuruno
ModelFELCOM 16
CategorySecurity System
LanguageEnglish

Related product manuals