EasyManua.ls Logo

GE akta pure - 5.3 Prime Inlets and Purge Pump Heads

GE akta pure
160 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5.3 Prime inlets and purge pump heads
Introduction
Before usage of the system pumps, it is important to:
Prime the inlets (fill the buffer inlets with liquid).
Purge the system pumps (remove air from the pump heads).
Note that the procedures described in this section may have to be adapted if
your system configuration differs from the one described in this manual.
Note:
For instructions on how to prime the inlets and purge the pump heads, see Section 4.5
Prime inlets and purge pump heads, on page 91.
108 ÄKTA pure Operating Instructions 29022997 AF
5 Prepare the system for a run
5.3 Prime inlets and purge pump heads

Table of Contents

Related product manuals