EasyManua.ls Logo

GE akta pure - Install Waste Tubing

GE akta pure
160 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4.2.4 Install waste tubing
Waste tubing overview
The table below lists the waste tubing of the instrument and where it is located. Make
sure that the waste tubing is connected to the correct positions on the modules.
Location of tubingTubing connectionsModule
Front of the ÄKTA pure instru-
ment.
Waste ports W1 and W2Injection valve
Front of the ÄKTA pure instru-
ment.
Waste port W3pH valve (optional)
Front of the ÄKTA pure instru-
ment.
Waste port WOutlet valve (optional)
Rear of the ÄKTA pure instru-
ment.
Drainage hole of the
Buffer tray
Buffer tray (Rescue
drainage)
Prepare waste tubing
Follow the instructions below to prepare the waste tubing.
CAUTION
Fasten the waste tubing. During operation at high pressure the
ÄKTA pure instrument may release bursts of liquid in the waste
tubing. Securely fasten all waste tubing to the ÄKTA pure instrument
and to the waste vessel.
CAUTION
Make sure that the waste vessel will hold all the produced volume
of the run. For ÄKTA pure, a suitable waste vessel should typically
have a volume of 2 to 10 liters.
NOTICE
The maximum level of the waste vessel must be lower than the
bottom of the ÄKTA pure instrument.
80 ÄKTA pure Operating Instructions 29022997 AF
4 Installation
4.2 Hardware installation
4.2.4 Install waste tubing

Table of Contents

Related product manuals