EasyManuals Logo

GE akta pure User Manual

GE akta pure
160 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #119 background imageLoading...
Page #119 background image
6.1 Before you start
Introduction
Before starting a run, it is necessary to read and understand the information in this
section and to perform the checks listed below.
CAUTION
Reversed Phase Chromatography (RPC) runs with 100% acetoni-
trile in ÄKTA pure. Always replace the PEEK tubing between the
used system pump and the pump pressure monitor with orange
PEEK tubing, i.d. 0.5 mm, before running RPC with 100% acetonitrile.
The tubing to be replaced is green for 25 ml/min systems and beige
for 150 ml/min systems. Set the System pressure alarm to 10 MPa
for 25 ml/min systems.
CAUTION
Always use appropriate personal protective equipment during op-
eration and maintenance of ÄKTA pure.
CAUTION
Hazardous substances. When using hazardous chemical and bio-
logical agents, take all suitable protective measures, such as
wearing protective glasses and gloves resistant to the substances
used. Follow local and/or national regulations for safe operation,
maintenance and decommissioning of the equipment.
CAUTION
High pressure. ÄKTA pure operates under high pressure. Wear
protective glasses at all times.
CAUTION
Risk of explosion. Do not use Mixer chamber 15 ml in the low flow
system. The maximum pressure for Mixer chamber 15 ml is 5 MPa.
ÄKTA pure Operating Instructions 29022997 AF 119
6 Run a method
6.1 Before you start

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE akta pure and is the answer not in the manual?

GE akta pure Specifications

General IconGeneral
BrandGE
Modelakta pure
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals