EasyManua.ls Logo

GE akta pure - Delivery and Storage

GE akta pure
160 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4.1.1 Delivery and storage
Introduction
This section describes the requirements for receiving the delivery box and storing the
instrument before installation.
CAUTION
Heavy object. Use proper lifting equipment, or use two or more
persons when moving the instrument. All lifting and moving must
be performed in accordance with local regulations.
When you receive the delivery
Record on the receiving documents if there is any apparent damage on the delivery
box. Inform your GE representative of such damage.
Move the delivery box to a protected location indoors.
ÄKTA pure delivery box
The ÄKTA pure instrument is shipped in a delivery box with the following dimensions and
weight:
WeightDimensions (mm)Contents
up to 64 kgw660 × h850 × d600ÄKTA pure instru-
ment with acces-
sories
660 mm
600 mm
850 mm
ÄKTA pure Operating Instructions 29022997 AF 57
4 Installation
4.1 Site preparation
4.1.1 Delivery and storage

Table of Contents

Related product manuals