EasyManua.ls Logo

GE akta pure - Page 110

GE akta pure
160 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Attach a column holder and
connect a column
Follow the instructions below to connect a column to the instrument. Always use a column
holder. If a column valve is used, connect the column to the appropriate A and B ports
on the valve. If no column valve is used, connect the column directly to the flow path
tubing. Use appropriate tubing and connectors. The instructions below show a system
configured with Column valve V9-Cs.
ActionStep
Attach an appropriate column holder to the rail on the instrument.1
Attach the column to the column holder.2
Connect a suitable tubing to a Column valve port, in this example port 1A.3
Open the System Control module.4
110 ÄKTA pure Operating Instructions 29022997 AF
5 Prepare the system for a run
5.4 Connect a column

Table of Contents

Related product manuals