Step Action
3 Unscrew the eight screws on the pump motor cover.
Note:
R
epeat this step for the second pump.
4 Disconnect the two cables on the pump motor. The connections can be
t
urned for easier access.
Note:
R
epeat this step for the second pump.
4 Installation
4
.2 Transport and moving of the system
ÄKTA ready XL Operating Instructions 29281616 AE 83
*** TeDIS Valid on Date Printed Printed on: 15-09-2023 11:27:35 ***