Step Action
5 Remove the bolts and fitting for the grounding wire and the cable holders
s
o that the cables and holders can be placed on the system.
6 Pull the disconnected pump wagon away from the system.
7 Position buffering blocks on the lifting forks.
8 Carefully position the lifting forks so that they are positioned under the
p
ump wagon. The recommended position is illustrated below.
9 Carefully lift the wagon, no higher than necessary for clearance, and move
t
he the wagon to its designated location.
4 Installation
4
.2 Transport and moving of the system
84
ÄKTA ready XL Operating Instructions 29281616 AE
*** TeDIS Valid on Date Printed Printed on: 15-09-2023 11:27:35 ***