EasyManua.ls Logo

GE AKTA ready XL - Page 84

GE AKTA ready XL
172 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Step Action
5 Remove the bolts and fitting for the grounding wire and the cable holders
s
o that the cables and holders can be placed on the system.
6 Pull the disconnected pump wagon away from the system.
7 Position buffering blocks on the lifting forks.
8 Carefully position the lifting forks so that they are positioned under the
p
ump wagon. The recommended position is illustrated below.
9 Carefully lift the wagon, no higher than necessary for clearance, and move
t
he the wagon to its designated location.
4 Installation
4
.2 Transport and moving of the system
84
ÄKTA ready XL Operating Instructions 29281616 AE
*** TeDIS Valid on Date Printed Printed on: 15-09-2023 11:27:35 ***

Table of Contents

Related product manuals