Move the system
Step Action
1 Make sure the pump wagon is disconnected from the system.
2 Position buffering blocks on the lifting forks.
3 Carefully position the lifting forks so that they are positioned under the
s
ystem. The two optional correct positions are illustrated below.
4 Carefully lift the system, no higher than necessary for clearance, and move
t
he system to its designated location.
Make sure to reconnect the pump wagon to the system and reposition it under the
s
ystem at its final location. Reassembly of the pump wagon is performed by reversing
the procedure described in steps 1 to 6 of Disconnect and move the pump wagon, on
page 82.
4 Installation
4
.2 Transport and moving of the system
ÄKTA ready XL Operating Instructions 29281616 AE 85