EasyManua.ls Logo

GE AKTA ready XL - Page 85

GE AKTA ready XL
172 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Move the system
Step Action
1 Make sure the pump wagon is disconnected from the system.
2 Position buffering blocks on the lifting forks.
3 Carefully position the lifting forks so that they are positioned under the
s
ystem. The two optional correct positions are illustrated below.
4 Carefully lift the system, no higher than necessary for clearance, and move
t
he system to its designated location.
Make sure to reconnect the pump wagon to the system and reposition it under the
s
ystem at its final location. Reassembly of the pump wagon is performed by reversing
the procedure described in steps 1 to 6 of Disconnect and move the pump wagon, on
page 82.
4 Installation
4
.2 Transport and moving of the system
ÄKTA ready XL Operating Instructions 29281616 AE 85
*** TeDIS Valid on Date Printed Printed on: 15-09-2023 11:27:35 ***

Table of Contents

Related product manuals