4.2 Transport
Introduction
This section outlines important information that must be considered when transporting
ÄKTAprocess.
Transport in crate
Use a pallet jack or forklift with a minimum capacity to match the weight of the system
plus the transport box. Refer to Section 8.1 Specifications, on page 164 regarding system
weight.
Make sure that intended openings and apertures are large enough to allow
passage of the box when lifted from the floor for transport.
Note:
The crate dimensions are shown below.
Cabinet 10: 111 (w) x 207 (l) x 173 (h) cm
Cabinet 30: 131 (w) x 268 (l) x 193 (h) cm
Moving when unpacked
WARNING
Heavy object. Because of the significant weight of
ÄKTAprocess, great care must be taken not to cause squeezing or
crushing injuries during movement. At least two, but preferably
three or more, persons are recommended when moving the unit.
NOTICE
Operator console
Do not use the operator console to push or drag the system
Do not lean on the console
The console arm is only designed to support the weight of the
operator console.
84 ÄKTAprocess Operating Instructions 29-0252-49 AA
4 Installation
4.2 Transport

Table of Contents

Other manuals for GE AKTAprocess

Related product manuals