EasyManua.ls Logo

GE Innova 3100 - Page 217

GE Innova 3100
290 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7.
Put in place the two forms to build side support with anchor .
Illustration 6-29:
8. Put the axis in the spool and raise the spool to avoid contact with the pallet.
9. Spool is ready to extract the cable sets.
Innova 2100-IQ, 3100/3100-IQ, 4100/4100-IQ Cardiovascular Imaging System Pre-Installation Manual
GE Healthcare Direction 5160944-13-1EN, Revision 2
Chapter 6 Electrical Connections 217

Table of Contents

Related product manuals