h. Connect the Fluoro UPS output cable from PDB power block 2 as follows (Illustration
6-44):
Output load 1 to X1- L1 terminal,
Output load 2 to X1-L2 terminal,
Output load 3 to X1-L3 terminal,
Output load neutral to X1-N-Load terminal.
Ground to X1-PE-Load terminal.
2.
Tie the power cables to the UPS and place the protection plates back on the UPS.
20.4 Finalization
No finalization steps.