Illustration 6-44:
f. Connect the Fluoro UPS rectifier input cable from PDB CB5 as follows (Illustration 6-44):
•
Rectifier input phase 1 to X1-L1-1 terminal,
•
Rectifier input phase 2 to X1-L2-1 terminal,
•
Rectifier input phase 3 to X1-L3-1 terminal,
•
Rectifier ground to X1-PE-rectifier terminal.
g.
Connect the Fluoro UPS by-pass input cable from PDB CB7 as follows (
Illustration 6-44):
•
By-pass input phase 1 to X2-L1-2 terminal,
•
By-pass input phase 2 to X2-L2-2 terminal,
•
By-pass input phase 3 to X2-L3-2 terminal
•
By-pass neutral input to X1-N-Bypass terminal.
•
By-pass ground to X1-PE-Bypass terminal.