GE
D
IRECTION 5535208-100, REV. 2 LOGIQ E9 SERVICE MANUAL
4 - 6 Section 4-2 - General procedures
4-2-2-3 Turn Unit ON (cont’d)
NOTE: Total time used for start-up is typically one and a half minutes or less. If starting after a power
loss or a lock-up, the start-up time may be up to four minutes.
Figure 4-3 2D Screen on the display