EasyManua.ls Logo

GE LOGIQ E9 - Page 296

GE LOGIQ E9
808 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE
D
IRECTION 5535208-100, REV. 2 LOGIQ E9 SERVICE MANUAL
7 - 48 Section 7-5 - Common Service Desktop
7-5-8-3 GFI (cont’d)
Name: GFE Access Test
Description: Reads the version of the GFE FPGA
Run Time: 00:01
If this test failed:
1.) Replace the GFI board.
Name: Relay LVDS Test
Description: Tests the LVDS connection between the GFI interface and the GRLY
Run Time: 00:02
If this test failed:
1.) Swap GFI boards and/or GRLY board to determine which board has failed.
2.) Replace the failed board.
Name: GFI Fan Test
Description: Test Front End card rack fan control and fan speed measurements
Run Time: 00:40
If this test failed:
1.) Check fan drawer in Front End Card Rack. Verify connection with backplane. Replace defective fan.
2.) Replace GFI board.
Name: GFI GTX Test
Description: Test communication with the GTX Board. (Same as the GFI Memory Test)
Run Time: 00:03
If this test failed:
1.) Based on failure information, replace the failed GTX or swap the GTX boards to isolated failure.
Name: GFI Fixed Demod Test
Description: GFI Fixed Demodulator signal path test. (Similar to the FDEMOD test with a slight variation
on how the test is run.)
Run Time: 00:03
If this test failed:
1.) Replace the GFI board.

Table of Contents

Other manuals for GE LOGIQ E9

Related product manuals