EasyManua.ls Logo

GE LOGIQ E9 - Page 303

GE LOGIQ E9
808 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE
D
IRECTION 5535208-100, REV. 2 LOGIQ E9 SERVICE MANUAL
Chapter 7 Diagnostics/Troubleshooting 7 - 55
7-5-8-8 Analog Receive (cont’d)
Tests the signal path from the GFI to the backplane (GTX) to the GRX.
Name: DC Offset Calibration Utility
NOTE: The DC Offset Calibration Utility diagnostic MUST be run when the DRX boards are replaced
or moved. See: Section 6-6 "DC Offset Calibration" on page 6-20.
Description: Measures and corrects for the DC offset of the ADCs on the DRX.
Run Time: 00:02
Run this utility to calibrate the correct DC offset after replacing or moving DRX boards. A popup
message alerts the user to run this utility after DRX boards have been replaced or moved.
Name: Analog RX Test (High Gain)
Description: Signal path test of the GRX boards with a TGC set to high (peak) gain. Failures could be
channel in DRX boards, Nathan, GRX to DRX communication.
Run Time: 00:02
If this test failed:
1.) Swap DRX boards to determine if the failure point changes as the boards are moved.
NOTE: A block of 8 dead channels indicates a failed DRX board.
2.) Replace any failed boards.
3.) Replace GRX boards (these cannot be swapped as one is 64 channel and one is 128 channel).
Name: Analog RX Test (Medium Gain)
Description: Signal path test of the GRX boards with a TGC set to medium gain.
Run Time: 00:02
If this test failed:
1.) Swap DRX boards to determine if the failure point changes as the boards are moved.
NOTE: A block of 8 dead channels indicates a failed DRX board.
2.) Replace any failed boards.
3.) Replace GRX boards (these cannot be swapped as one is 64 channel and one is 128 channel).

Table of Contents

Other manuals for GE LOGIQ E9

Related product manuals