EasyManua.ls Logo

GE LOGIQ E9 - Page 320

GE LOGIQ E9
808 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE
D
IRECTION 5535208-100, REV. 2 LOGIQ E9 SERVICE MANUAL
7 - 72 Section 7-5 - Common Service Desktop
7-5-8-13 bayBIRD Tests (cont’d)
Sensor 4 added for DriveBay2+ 3D Tracking System, introduced in R4.
Name: Run All Tests
Description: Runs all of the tests that are in the box
Run Time: 00:24
If this test failed:
1.) Run subsequent tests as identified in the failed test results
Name: Sensor 1
Description: Runs the tests for Sensor 1
Run Time: 00:21
If this test failed:
1.) Move the sensor (trandsucer) to a different port. If the transducer fails, replace the transducer.
2.) If the problem still persists, replace the bayBIRD.
Name: Sensor 2
Description: Runs the tests for Sensor 2
Run Time: 00:21
If this test failed:
1.) Move the sensor (transducer) to a different port. If the transducer fails, replace the transducer.
2.) If the problem still persists, replace the bayBIRD.
Name: Sensor 3
Description: Runs the tests for Sensor 3
Run Time: 00:21
If this test failed:
1.) Move the sensor (transducer) to a different port. If the transducer fails, replace the transducer.
2.) If the problem still persists, replace the bayBIRD.
Name: Sensor 4 (R4 and bayBird2+)
Description: Runs the tests for Sensor 4
Run Time: 00:21
If this test failed:
1.) Move the sensor (transducer) to a different port. If the transducer fails, replace the transducer.
2.) If the problem still persists, replace the bayBIRD.

Table of Contents

Other manuals for GE LOGIQ E9

Related product manuals