EasyManua.ls Logo

GE LOGIQ E9 - Page 324

GE LOGIQ E9
808 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE
D
IRECTION 5535208-100, REV. 2 LOGIQ E9 SERVICE MANUAL
7 - 76 Section 7-5 - Common Service Desktop
7-5-10-3 System Board
See: 7-5-3 "Diagnostics Window Overview" on page 7-22 for a description of this window’s features.
Runs tests on essential functions of the PC Mother Board. The test results are displayed in the Status
portion of the window.
Run Time: About 1 minute.
1.) Enter the desired Loop Count (numeric value of 4 digits or less).
2.) Click the Execute button. If there are any failures:
3.) Check the Motherboard Harness. Swap with a known good harness. If the problem continues:
4.) Replace the Motherboard. If the problem continues:
5.) Replace the BEP.

Table of Contents

Other manuals for GE LOGIQ E9

Related product manuals