EasyManua.ls Logo

GE LOGIQ E9 - Page 336

GE LOGIQ E9
808 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE
D
IRECTION 5535208-100, REV. 2 LOGIQ E9 SERVICE MANUAL
7 - 88 Section 7-5 - Common Service Desktop
7-5-14 4D Motor Controller
NOTE: This test requires a 4D probe be connected to the system. This test requires a 4D probe to be
connected to the system.
Name: Presence Test
Description: This test detects the presence of the 4D Motor Controller.
Run Time: 00:01
If this test failed:
1.) Verify USB connection between the Host and the Main Power Supply.
2.) Verify 4D Motor Controller connections in Main Power Supply.
3.) Replace 4D Motor Controller.
Name: Version Test
Description: Displays the 4D Motor Controller version number.
Run Time: 00:01
If this test failed:
1.) Verify USB connection between the Host and the Main Power Supply.
2.) Verify 4D Motor Controller connections in Main Power Supply.
3.) Replace 4D Motor Controller.

Table of Contents

Other manuals for GE LOGIQ E9

Related product manuals