EasyManua.ls Logo

GE LOGIQ E9

GE LOGIQ E9
808 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE
D
IRECTION 5535208-100, REV. 2 LOGIQ E9 SERVICE MANUAL
7 - 90 Section 7-5 - Common Service Desktop
7-5-15 Patient I/O Tests
Under Service Diagnostics / Patient I/O.
This procedure provides a basic test of the ability of the system to start and stop the acquisition of data
from the Patient I/O Module to the Host via the GFI.
INPUT > The connection of ECG leads, PHONO (PCG) or AUX is optional.
OUTPUT > The results display information about the signal data acquired from the ECG input to the
Patient I/O Module. The information includes the minimum signal value, maximum signal value and
mean signal value.
If this test fails:
1.) Run GFI tests
If GFI is ok:
2.) Replace Patient I/O module
If this test passes and there are still issues with poor or no ECG trace, replace ECG leads.

Table of Contents

Other manuals for GE LOGIQ E9

Related product manuals