EasyManua.ls Logo

GE Versana Balance - Page 429

GE Versana Balance
431 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Versana Balance – Basic Service Manual Index-3
5808768-100 English Rev.9
physical dimensions, 3-20
physical inspection
at arrivel, 3-18
position
of tilt and shock indicators, 3-9
Power On, 3-24
precautions
certified electrical contractor statement, i-16
damage in transport, i-16
important precautions, i-3
service safety considerations, i-17
translation policy, i-3
prepeare for setup, 3-18
prerequisite
provided by customer, 8-9
print keys
assigning to a device or dataflow, 3-91
probe
connect, 3-24
probe cleaning, 10-18
probe leakage current test, 10-28
probe maintenance, 10-17
basic probe care, 10-17
basic probe cleaning, 10-18
probe related checks, 10-17
probe related checks, 10-17
probes environmental requirements, 2-11
operational and storage temperature for probes,
2-11
product icons, 1-11
product locator installation card, 3-106
products covered by this manual, 1-5
proprietary to GE Healthcare, i-18
Purchaser responsibilities, 2-13
R
rear panel
connections, 3-24
receiving and unpacking, 3-6
receiving the product, 3-8
recycling information
packing materials, 3-17
removable media
verifying, 3-94
required facility needs, 2-14
requirements, 2-3
requirements verification, 3-20
returning/shipping probes and repair parts, 1-24
revision history, i-1
S
safety
human, 1-14
safety precaution messages, 1-8
safety test overview, 10-20
service safety considerations, i-17
setup
completion, 3-19
preparations, 3-18
reminders, 3-3
setup time, 3-3
setup warnings, 3-3
shipping/returning probes and repair parts, 1-24
shock and tilt indicators
position, 3-9
shock indicator, 3-7
site preparations, 2-1
time and manpower requirements, 2-11
software loading, 8-9
software/hardware compatibility, 9-4
software-hardware
compatibility, 5-3
specifications, 3-20
electrical specifications, 3-21
physical dimensions, 3-20
standard GE tool kit, 10-7
standard hazard icons, 1-9
statement
certified electrical contractor statement, i-16
system
specifications, 3-20
system checks, 10-12
system maintenance, 10-11
physical inspection, 10-15
preliminary checks, 10-11
system manufacturer, 1-28
system requirements verification, 3-20
system setup, 3-1
T
tilt and shock indicators
position, 3-9
tilt indicator, 3-7
time and manpower requirements
site preparations, 2-11
tools required, 10-7
special tools, supplies and equipment, 10-10
standard GE tool kit, 10-7
trademarks, i-18
translation policy, i-3
transport
damage, i-16
transportation
shock indicator, 3-7
tilt indicator, 3-7
transportation box label, 3-11
typical users of the service manual, 1-4
U
unpacking, 3-6
USB
flash card

Table of Contents

Related product manuals