Index-2 Versana Balance – Basic Service Manual
5808768-100 English Rev.9
EMI, 1-25
abatement, 2-10
prevention, 2-10
protection, 3-18
environmental dangers, 2-21
environmental specifications for the unit, 2-4
errors, i-17
ESD, 1-25
ESD prevention, 1-26
ethernet
connect, 3-24
examine packages, 3-8
external I/O
connections, 3-24
F
facility needs, 2-12
desirable features, 2-15
DICOM network function, 2-19
DICOM setup requirements, 2-20
InSite requirements, 2-19
network setup requirements, 2-19
purchaser responsibilities, 2-13
recommended floor plan suggestion, 2-17
required facility needs, 2-14
suggested floor plan
scanner and EchoPAC in same room, 2-18
flash card
connect, 3-24
floor plan suggestion
recommended, 2-17
scanner and EchoPAC in same room, 2-18
functional checks, 10-12
mains cable inspection, 10-13
system checks, 10-12
G
GE Healthcare leakage current limits, 10-22
general console requirements, 2-3
generic procedure on probe leakage current, 10-29
grounding continuity, 10-25
H
hardware/software compatibility, 9-4
hardware-software
compatibility, 5-3
hot or cold
if the unit is very cold or hot, 2-3
how often should maintenance tasks be performed?,
10-5
human safety, 1-14
I
icons, 1-7
icons indicating a special procedure to be used, 1-10
if the unit is very cold or hot, 2-3
important precautions, i-3
InSite
network requirements, 2-19
installation
see "system setup", 3-1
installation warnings
see "setup warnings", 3-3
introduction (chapter 1), 1-1
L
labels
transportation box label, 3-11
legal notes, i-18
lighting, 2-5
list of abbrevations, 9-3
loading software, 8-9
lockout/tagout (LOTO) requirements, 1-23
LOTO
lockout/tagout requirements, 1-23
M
mains cable inspection, 10-13
maintenance
physical inspection, 10-15
preliminary checks, 10-11
system maintenance, 10-11
maintenance task schedule, 10-5
manufacturer, 1-28
mass
with monitor and peripherals, 3-20
mechanical safety, 1-17
model designations, 1-7
models covered by this manual, 1-5
N
network setup requirements, 2-19
O
omission and errors, i-17
operational and storage temperature for probes, 2-11
Operator controls, 4-36
P
packing materials
recycling information, 3-17
paperwork
after setup, 3-105
PDF files
display and print, 4-30
periodic maintenance inspection (PM), PM (periodic
maintenance inspection), 10-4
phone numbers
customer assistance, 1-28