EasyManuals Logo

GE Voluson P8 Service Manual

GE Voluson P8
553 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #144 background imageLoading...
Page #144 background image
GE HEALTHCAREDRAFT VOLUSON® P8 / VOLUSON® P6
DIRECTION 5459672-100, R
EVISION 6 DRAFT (JANUARY 17, 2013) PROPRIETARY SERVICE MANUAL
Chapter 4 - Functional Checks 4-3
4-3-1-1 Scanner Power On (cont’d)
5.) Hold down the On/Off
button (see: Figure 4-2) on the control panel for ~3 seconds.
NOTE: The power for on-board peripheral auxiliary equipments are commonly switched with the
ON/OFF button. The power switch of any attached printer(s) needs to be in ON position before starting
the system. However, be aware some auxiliary equipment may switch itself to standby mode
(e.g., Color video printer) and must therefore be switched on separately.
As soon as the software has been loaded, the system enters 2D-Mode with the probe and application
that were used before the system was shut down. Total time used for start-up is about 2 minutes.
NOTE: The power for on-board peripheral auxiliary equipments are commonly switched with the
ON/OFF button. So the auxiliary equipment need not to be switched ON/OFF separately.
Figure 4-2 On/Off Button on Control Panel
On/Off Button

Table of Contents

Other manuals for GE Voluson P8

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE Voluson P8 and is the answer not in the manual?

GE Voluson P8 Specifications

General IconGeneral
CategoryUltrasound System
Probe Ports3 active probe ports
DICOMYes
Power Requirements100-240 VAC, 50/60 Hz
ApplicationsObstetrics, Gynecology
Imaging ModesColor Doppler, Power Doppler
ConnectivityEthernet, USB
Operating SystemWindows-based

Related product manuals