ADP200 Application PID-IMM User Manual Pag. 18 of 80
4.2 Preliminary operations and PID-IMM application startup (Guided Procedure)
The following steps must be performed prior to the guided procedure:
• Electrical connections Step 1
• Setting motor parameters Step 2
• Autotune with rotating motor / at stand-still or coupled to the load Step 3
• Setting encoder parameters Step 4
• Encoder phasing (rotating or still) Step 5
• Setting speed parameters Step 6
• Motor overload setting Step 7
• Motor overtemperature setting Step 8
• Braking resistor setting Step 9
• Setting application parameters Step 10
• Analog input setting Step 11
• Saving parameters Step 12
Note! Check the connections, with particular attention to shieling (see wiring diagram) in order to reduce interference and
noise. Take particular attention to the Resolver/Encoder shield connection for detail see. ADP200 QS manual.
See the ADP200 QS manual for details on steps 1….9, 11 and 12.