:
The following functions are available:
– Modify and manage coating programs and application data
– Operating data management (LM)*
– Configuration*
– Diagnostics*
– Settings
* with the exception of some functions that are only available after
switching on the control voltage. In some cases, the frequency
converter must also be started up and the control units supplied with
power.
8. Turn the key switch to turn on the control voltage.
– The indicator lamp lights up.