Page 27 of 127
Operating Manual
OMGEM5KN – Iss. 5.1
Copyright – Geotechnical Instruments (UK) Ltd
Power supply front and back drawing:
0.4A @ 100VAC..0.2A @ 240VAC
Note: This charger has been internally restricted to 1.5A.
Cleaning instructions
Do NOT use any cleaning agents to clean the analyser or battery charger as they may have an adverse effect on
the safe use of these devices.
Memory
The analyser's memory is stored in a readings and configuration database. The analyser will prompt when its
memory is full, and you will not be able to store any further readings. Please download your readings via GAM or
the Basic Download Software and then clear the memory.
Note: The analyser should never be stored for prolonged periods with valuable data in its memory. It is
advisable to download all readings to GAM at the end of each day’s monitoring. To clear the memory, please
refer to the Gas Analyser Manager (GAM) operating manual.