EasyManuals Logo

Geotech GEM5000 User Manual

Geotech GEM5000
127 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #50 background imageLoading...
Page #50 background image
Page 50 of 127
Operating Manual
OMGEM5KN Iss. 5.1
Copyright Geotechnical Instruments (UK) Ltd
GEM5000
TAKING READINGS
Preliminary checks before taking readings (best practice)
Start
ID codes and
information
uploaded
Battery has good
charge
Check span
calibration
Take readings
Step 1
Step 5
Analyser
has correct time and
date set
Water trap filter is
clean and dry
Gases
zeroed
Step 2
Step 3
Step 4
Step 6
Step 7
Prior to use, it is good practice to ensure
that:
Step 1 If using GAM ID codes and
information have been
uploaded from GAM to the
analyser. Please see section
8.1.1 for more information on
this.
Step 2 The instrument has the correct
time and date set.
Step 3 The water trap filter is fitted
and is clean and dry.
Step 4 The battery has a good charge
(minimum 25% charge, even if
only a few readings are
required).
Step 5 All gas channels have been
zeroed, without gas
concentration present.
Step 6 If necessary check the span
calibration with a known
concentration calibration gas.
Step 7 Take readings.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Geotech GEM5000 and is the answer not in the manual?

Geotech GEM5000 Specifications

General IconGeneral
BrandGeotech
ModelGEM5000
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals