EasyManua.ls Logo

GReddy e-01 - Required Installation Tools

GReddy e-01
55 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. Parts List
Important!
The Display unit is packaged with the SD card already inserted.
4
Tools required for installation:
Voltage tester Wire cutters
Pliers Screw drivers (+,-)
10mm wrench Solder and Soldering iron
Electrical tape Zip ties
Pressure sensor Valve unit harness Pressure harness
(2.5m) (2.5m)
6ø Hose fitting x2 Hose clamp Three way fitting
Rubber washer 4ø Hose (1m) 6ø Hose (1m)
M4 Bolt M6 Bolt x2 Valve bracket
e-01英語版03.3.1920:28ページ5

Table of Contents

Related product manuals