5 - Operation
5.8
3. Event Selection:
ATTENTION! This step is not visible if
previous events has been closed. For more
information see “Ending an Event”.
New Event:
A. Select “New Event”.
C. Press to continue.
Or select:
A. One of the previous events to add
application to a previous event.
B. Press the drop down menu to change
the application product.
C. Press to continue.
4. Options:
A. Press to edit or change the
region name from the system default
if desired.
If resuming a previous event, other
possible options are:
Press the “Region” button to change
to a previous setup Region.
Or press to create a new
region or change the controlling
product.
B. Press the “Controlling Product” drop
down menu to change application
product.
C. Press to confirm.
A new Event will be created.
Start New Event
Event Selection
Event: 2014-11-20_16:00:00
Start New Event
Event Selection
Water
Event: 2014-11-20_16:00:00
Event: 2014-11-19_16:10:30
Options
Region
Controlling Product
Water (L)