VPL400-X: Install Manual
21JULY2023 | 630-00159 B
10
PREPARATION
VPL400-X: SECTION 3
SITE PREPARATION
•
power supply and disconnect per NFPA 70.
•
of the concrete slab must be large enough for
• If there was a blueprint created for the project,
check that all work matches the blueprint.
Running clearance measurements should be
top landing and overhead clearance. Ensure
there are no pinch points.
• If doors are supplied by others check that they
mount doors are required. If other non Harmar
supplied equipment (interlocks) are going to
equipment.
• The front tower panel and the top cover must be
removed before any power, gate/door, call send
CONCRETE
• Concrete pad should be no less than 4" thick,
3500 PSI reinforced, and must be level. The size
of the concrete pad may vary depending on the
approach to the VPL must be large enough
to turn a mobility device around. Pay close
on the exterior of a house or building are
normally sloped to shed water. The normal slope
"" per foot to provide adequate
drainage. Steel shims should be used to level the
" per foot, it should be reworked and
leveled before installing the VPL.
Wood shims should never be used on either inside or
outside applicaons.
CAUTION
!
NOTE: Do not shim more than 7/8".
• Harmar recommends securing the lift using
our Anchor Kit
NOTE: DO NOT install on brick, landscape paver or asphalt
surface.
MATERIAL HANDLING
Do not li unit from boom of the plaorm. This will
cause damage to the safety systems.
CAUTION
!
• It may be necessary to move the VPL around
once it’s on the job site. Extra material handling
equipment such as manual carts, a pallet jack,
by manpower. All tower panels can be removed
to reduce the weight of the tower. Care should
be taken not to scratch or damage panels when
removing, carrying, and reinstalling them.
• Special care must be taken to protect any
be damaged by the uses of material handling
equipment.