ASSEMBLY AND ANCHORING
6-2 MS 3000 9095-032A
6.1 Preparation for assembly
Ensure that the site where the
mast climbing work platform will
be assembled accords with the
national requirements and that
permission has been obtained
from the relevant authorities for
the assembly.
- Ensure that a suitable power supply,
good lighting, lifting equipment and
tools are available.
- Ensure that the building site is easily
accessible to the vehicle which will
deliver the mast climbing work
platform.
- Prepare the site with suitable support
and anchoring facilities.
- Ensure that the position where the
mast climbing work platform will stand
has good drainage.
- Plan the positioning of the mast
climbing work platform so that where
the mast needs to be anchored, it can
be so anchored with the standard
material.
- The components of the mast climbing
work platform mast should be placed
as close as possible to the place
where it will be assembled.
- The electrical power supply connection
must be placed as close to the mast
climbing work platform as possible so
as to reduce the voltage drop to a
minimum. If the voltage reduction is
too great the machine may not function
correctly.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the HEK MS 3000 and is the answer not in the manual?

HEK MS 3000 Specifications

General IconGeneral
BrandHEK
ModelMS 3000
CategoryConstruction Equipment
LanguageEnglish